False kitchen ceiling in Mazarrón
Concealing an extraction duct requires its route, bends and clearance to be established first. Coordinate hood installation with available height before designing the ceiling enclosure. The final shape must also work with wall units; an arbitrary ceiling drop may not accommodate the actual duct.
Tell us about your kitchen
Choose the type of renovation and the approximate size. Then write to us or fill out the form.
Height, installations and ceiling finishes
- Free heightMeasurement of space and upper elements.
- FacilitiesCoordination with planned ducts and light points.
- StructureDefinition of the substructure and fixings.
- HobsPlacement of the agreed hob system.
- RecordsAccess to elements that must be reviewable.
- FinishTreatment of joints and finishes according to scope.
Kitchen false ceiling quote in Mazarrón
Coordinate finishing and opening of furniture
A column or lift-up front may require overhead clearance to mount and operate. If the new roof is decided without them, the joint may end up limiting its use. Represents heights and openings in the same section to check what will be preserved and how the top line will be resolved, differentiating the furniture adjustments from the proposed ceiling finish.
Provide lighting and maintenance in the same plan
The location of spotlights must respond to the surfaces where it is worked and to the elements that could produce shade. It is also interesting to place accesses to components that need revision before closing. Coordinating the kitchen lighting allows you to define these positions with the set, so that the solution does not depend on drilling afterwards a finished finish by a need that was already known at the beginning.
Quote and scope of work at Mazarrón
The hood duct is studied with available equipment, route and height. We assess the roof that can accommodate the compatible solution, differentiating the finials and registers from the adaptations specific to the extraction that have been agreed to be installed.
Price reference and scope
€20–35/m². Reference for a continuous plasterboard ceiling. A small kitchen may be subject to a minimum job charge.
Published guide; your quotation confirms tax and exclusions. Habitissimo






