Comprehensive kitchen renovation↗
Coordinated work, installations, furniture and finishes.
If you want to renovate just one wall strip, mark its ends and the surrounding furniture. A localized dashboard needs to study the support and its edges, as well as a larger coating. The tile service should describe this preparation and joints with nearby sockets and surfaces to understand which part of the work is included in the proposal. See also: tiling service.
Choose the type of renovation and the approximate size. Then write to us or fill out the form.
Coordinated work, installations, furniture and finishes.
The handles can cross when opening two pieces of furniture facing each other.
A new finish must also cover the sides that remain visible.
The extraction duct needs a studied route until its exit.
Cleaning products require a defined place within the set.
Accumulated grease requires preparation before appraising a painting.
A bulky utensil can decide the interior of a unit.
Packaged furniture needs a reception and inspection area.
A matte surface requires knowing its cleaning instructions.
A clear joint may require different care than the tile itself.
A dark finish should be evaluated with the light in the room.
The hood may require a run through the ceiling.
New equipment adds connections within an already occupied space.
The choice of board affects the connection needs.
The colour of the fronts changes depending on the light they receive.
The width of the equipment must be decided together with the chosen hob.
The oven connection needs to be coordinated with the column hole.
Moving an outlet or removing the sink may be necessary to make a seemingly finish-focused upgrade. It is advisable to identify these dependencies before ordering the tasks. A list of the elements that are preserved makes it possible to study what needs to be dismantled and replaced, preventing a finished surface from subsequently preventing the adaptation of a connection that was already provided for in the design.
If the furniture front will remain the same, the proposal can focus on its adjacent surfaces. If you also change your height or position, you should coordinate both jobs so as not to repeat finishing details. In the kitchen quote, these ranges can be distinguished, so that each alternative explains what it maintains, what it modifies and what use needs it solves before choosing materials or ordering parts.
Full renovation: €475–1,900/m² as a planning reference. Individual jobs may cost less. See the itemised quotation.